2022 Installation Plan
Revision as of 00:35, 22 December 2022 by Fletcherrgm (talk | contribs)
Prioritized list of gage locations to be improved or installed during summer and fall of 2020 following the gage installation guidelines. Detailed installation plan outline on each gage's page.
| Priority Rank | Gage Location | Structure Built | Install Status | New Post | Extend Post | Improve Signal | Improve Access | Improve Range |
| 1 SVPA-19 | DONE | |||||||
| 2 SVPA-7 | DONE | |||||||
| 3 SVPA-7B | DONE | |||||||
| 4 SVPA-9 | ||||||||
| 5 SVPA-9B |