2022 Installation Plan

From floodzilla-wiki
Jump to navigation Jump to search

Prioritized list of gage locations to be improved or installed during summer and fall of 2020 following the gage installation guidelines. Detailed installation plan outline on each gage's page.

Priority Rank Gage Location Structure Built Install Status New Post Extend Post Improve Signal Improve Access Improve Range
1 SVPA-19 DONE
2 SVPA-7 DONE
3 SVPA-7B DONE
4 SVPA-9
5 SVPA-9B