Floodzilla Meeting Notes/2020-09-09
Revision as of 16:12, 9 September 2020 by GearyEppley (talk | contribs)
Attendees: Cynthia, Lisa, Geary, Dean, Dave
Gage Steward
- Split job description in two: 1) Gage Steward (the physical). 2) Data Steward - Lisa
Gage Installs
- NE 124th W mount is up. Need to mount sensor. Hoping to connect to
- This week.
- Tolt Hill Bridge.
- Review Keller Dairy. Need to be more accessible. Need to be able to measure the sensor height and get back to same location every time.
- Stossel - Calibrate with USGS sensor that is in NGVD-29. Need to put asterisk on page.
- Tall Chief Receiver - Dean to reach out to Travis.
- Dave to sync w/ Lisa on configuring Stossel bridge receiver
Site
- Subscription stuff is ready to test on staging site - Geary to test
- Need text for alert emails - Geary
--