Flood Forecasting
Revision as of 14:30, 31 March 2020 by DaveSanderman (talk | contribs)
Flood Forecasting
Our current plans for flood forecasting involve three phases:
- Short-term prediction
- Crest prediction
- Flood forecasting
Short-term Prediction
By "short-term prediction", we mean extrapolating from current water levels in order to predict when near-term critical events like road-crossings will happen.
Crest Prediction
We want to be able to predict crest timing at a particular gage or area based on the timing of crests at upstream gages.
Flood Forecasting
Long-term, we want to build a model using all of the possible inputs that might have an effect on water level. Examples:
- Weather forecasts
- Rainfall
- Temperature
Using this model, we want to be able to try to predict water levels well in advance of flood events.