Flood Forecasting

From floodzilla-wiki
Revision as of 20:47, 10 May 2020 by GearyEppley (talk | contribs)
Jump to navigation Jump to search

Flood Forecasting

Our current plans for flood forecasting involve three phases:

  1. Short-term prediction
  2. Crest prediction
  3. Flood forecasting

Short-term Prediction

By "short-term prediction", we mean extrapolating from current water levels in order to predict when near-term critical events like road-crossings will happen.

Linear Trend Extrapolation
  • On the gage details page
    • Create extrapolated readings every 15 minutes from the last reading until last reading + 6 hrs.
    • Show extrapolated readings on chart with a different color.
    • If extrapolated readings cross a road (rising or falling) display a notice:
      • "Based on current trend, the flood water will be [higher / lower] than the road after HH:MM pm/am"
Model Based Short-term Prediction

Predict the next 4-8 hours at each gage. Most short term (4-8 hrs) flooding impacts in the lower valley will be the result of rain that has already fallen.

We should consider using the following inputs to build a model:

  • Gage trend
  • Upstream readings and trends
  • Upstream major tributary readings and trends
  • Meteorological readings from various stations in the watershed:
    • Temperature
    • Snowpack
    • Rainfall

Predict the following for each gage:

  • Road crossing time
  • Yellow / Red status change time
  • Crest time
  • Crest height

Crest Prediction

We want to be able to predict crest timing at a particular gage or area based on the timing of crests at upstream gages.

  • For each gage build a model for each upstream gage that predicts the timing of the gage's crest based on the timing and height of the upstream gage
    • For example, if gage C has two upstream gages, A and B. Build two models. One that predicts the timing of the crest of C based on A and one based on B.
  • Only consider gages from USGS at the falls to USGS at Duvall
  • Formalize the definition of a crest
    • Something like: crest is confirmed after three down readings with no up readings.
    • How do we handle a turbulent gage?
    • How do we calculate the time of the crest? First highest point?
  • Phase I: Height independent. Calculate median time based on past data.
  • Phase II: Try to model hight. Maybe start with simple linear fit.
  • Gage Details page:
    • Show prediction based on nearest upstream gage that has crested
    • Show confidence interval with prediction
    • Example:
      • Estimated crest at Gage C based on observed crest at Gage A: 5:10 pm (+/- 90 minutes)

Flood Forecasting

Long-term, we want to build a model using all of the possible inputs that might have an effect on water level. Examples:

  • Weather forecasts
    • Rainfall
    • Temperature

Using this model, we want to be able to try to predict water levels well in advance of flood events.