Floodzilla Meeting Notes/2020-09-09

From floodzilla-wiki
Revision as of 16:13, 9 September 2020 by GearyEppley (talk | contribs) (→‎Gage Installs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Attendees: Cynthia, Lisa, Geary, Dean, Dave

Gage Steward

  • Split job description in two: 1) Gage Steward (the physical). 2) Data Steward - Lisa

Gage Installs

  • NE 124th W mount is up. Need to mount sensor. Hoping to connect to
  • This week.
    • Finish 124th W
    • Tolt Hill Bridge.
    • Review Keller Dairy. Need to be more accessible. Need to be able to measure the sensor height and get back to same location every time.
  • Stossel - Calibrate with USGS sensor that is in NGVD-29. Need to put asterisk on page.
  • Tall Chief Receiver - Dean to reach out to Travis.
  • Dave to sync w/ Lisa on configuring Stossel bridge receiver

Site

  • Subscription stuff is ready to test on staging site - Geary to test
  • Need text for alert emails - Geary

--