Difference between revisions of "Floodzilla Meeting Notes/2020-07-29"
Jump to navigation
Jump to search
GearyEppley (talk | contribs) |
GearyEppley (talk | contribs) |
||
| Line 17: | Line 17: | ||
* Start with Robotics students as data monitors. | * Start with Robotics students as data monitors. | ||
==Software== | ==Software== | ||
| + | * For home page with historical dates: | ||
| + | ** Show all locations as "Active" that were active during range | ||
| + | ** Show status color icons on chart based on Max (or Peak) height in range | ||
| + | ** Replace last reading with 'Peak' readings | ||
| + | ** Show start date and end date + 1 in chart | ||
| + | ** Change chart to always be under name / reading like in mobile view | ||
Latest revision as of 00:52, 30 July 2020
Contents
Tolt Dam
- Find information on impact studies - Cynthia to research
Sensor Installs
- Wild Canary - Still no signal. Next step - Andy to bring back to office and test
- Tall Chief Receiver - Could see that it got an IP address via DHCP but couldn't connect or ping
- Next step - Take down receiver - Geary to reach out to Bucket Truck Trevor and connect with Andy
- If possible try plugging in laptop to receiver's cable to test if the cable is good
- Dean back out in a couple of weeks to do remaining installs
Seattle U
- Start with Robotics students as data monitors.
Software
- For home page with historical dates:
- Show all locations as "Active" that were active during range
- Show status color icons on chart based on Max (or Peak) height in range
- Replace last reading with 'Peak' readings
- Show start date and end date + 1 in chart
- Change chart to always be under name / reading like in mobile view