Difference between revisions of "Floodzilla Meeting Notes/2020-09-09"

From floodzilla-wiki
Jump to navigation Jump to search
(Created page with "Attendees: Cynthia, Lisa, Geary, Dean == Gage Steward == * Split job description in two: 1) Gage Steward (the physical). 2) Data Steward - Lisa == Gage Installs == * NE 124th...")
 
Line 1: Line 1:
Attendees: Cynthia, Lisa, Geary, Dean
+
Attendees: Cynthia, Lisa, Geary, Dean, Dave
 
== Gage Steward ==
 
== Gage Steward ==
 
* Split job description in two: 1) Gage Steward (the physical). 2) Data Steward - Lisa
 
* Split job description in two: 1) Gage Steward (the physical). 2) Data Steward - Lisa

Revision as of 16:12, 9 September 2020

Attendees: Cynthia, Lisa, Geary, Dean, Dave

Gage Steward

  • Split job description in two: 1) Gage Steward (the physical). 2) Data Steward - Lisa

Gage Installs

  • NE 124th W mount is up. Need to mount sensor. Hoping to connect to
  • This week.
    • Tolt Hill Bridge.
    • Review Keller Dairy. Need to be more accessible. Need to be able to measure the sensor height and get back to same location every time.
  • Stossel - Calibrate with USGS sensor that is in NGVD-29. Need to put asterisk on page.
  • Tall Chief Receiver - Dean to reach out to Travis.
  • Dave to sync w/ Lisa on configuring Stossel bridge receiver

Site

  • Subscription stuff is ready to test on staging site - Geary to test
  • Need text for alert emails - Geary

--