Difference between revisions of "Floodzilla Meeting Notes/2020-09-09"

From floodzilla-wiki
Jump to navigation Jump to search
(Created page with "Attendees: Cynthia, Lisa, Geary, Dean == Gage Steward == * Split job description in two: 1) Gage Steward (the physical). 2) Data Steward - Lisa == Gage Installs == * NE 124th...")
 
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
Attendees: Cynthia, Lisa, Geary, Dean
+
Attendees: Cynthia, Lisa, Geary, Dean, Dave
== Gage Steward ==
+
==Gage Steward==
* Split job description in two: 1) Gage Steward (the physical). 2) Data Steward - Lisa
+
 
 +
*Split job description in two: 1) Gage Steward (the physical). 2) Data Steward - Lisa
 +
 
 +
==Gage Installs==
 +
 
 +
*NE 124th W mount is up. Need to mount sensor. Hoping to connect to
 +
*This week.
 +
**Finish 124th W
 +
**Tolt Hill Bridge.
 +
**Review Keller Dairy. Need to be more accessible. Need to be able to measure the sensor height and get back to same location every time.
 +
*Stossel - Calibrate with USGS sensor that is in NGVD-29. Need to put asterisk on page.
 +
*Tall Chief Receiver - Dean to reach out to Travis.
 +
*Dave to sync w/ Lisa on configuring Stossel bridge receiver
 +
 
 +
==Site==
 +
 
 +
*Subscription stuff is ready to test on staging site - Geary to test
 +
*Need text for alert emails - Geary
  
== Gage Installs ==
 
* NE 124th W mount is up. Need to mount sensor. Hoping to connect to
 
* This week.
 
** Tolt Hill Bridge.
 
** Review Keller Dairy. Need to be more accessible. Need to be able to measure the sensor height and get back to same location every time.
 
* Stossel - Calibrate with USGS sensor that is in NGVD-29. Need to put asterisk on page.
 
* Tall Chief Receiver - Dean to reach out to Travis.
 
* Dave to sync w/ Lisa on configuring Stossel bridge receiver
 
== Site ==
 
* Subscription stuff is ready to test on staging site - Geary to test
 
* Need text for alert emails - Geary
 
 
--
 
--

Latest revision as of 16:13, 9 September 2020

Attendees: Cynthia, Lisa, Geary, Dean, Dave

Gage Steward

  • Split job description in two: 1) Gage Steward (the physical). 2) Data Steward - Lisa

Gage Installs

  • NE 124th W mount is up. Need to mount sensor. Hoping to connect to
  • This week.
    • Finish 124th W
    • Tolt Hill Bridge.
    • Review Keller Dairy. Need to be more accessible. Need to be able to measure the sensor height and get back to same location every time.
  • Stossel - Calibrate with USGS sensor that is in NGVD-29. Need to put asterisk on page.
  • Tall Chief Receiver - Dean to reach out to Travis.
  • Dave to sync w/ Lisa on configuring Stossel bridge receiver

Site

  • Subscription stuff is ready to test on staging site - Geary to test
  • Need text for alert emails - Geary

--